Showing 1 - 25 of 10,000
Dedicated Freight Corridor Corporation of India Limited
2 days left
Development Of Gati Shakti Cargo Terminal (gct) On Railway Land (schedule '2' Of Gct Policy) Between New Dadri New Boraki
End Date
31 Jul 2026 12:00 PM
2 days left
Location
Dadri, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
1 day left
Supply Of Set Of Ermeto Nipple,reducer, Elbow,lock Nut And Plug For Elgi Make Air Compressor Type Trc-1000 Mn. As Per Drg No. Jhs/rs/4/sk. No. 699.alt-1 Set Comprising Of 07 Items 15 Nos [ Warranty Period: 30 Months After The Date Of Delivery ]
End Date
30 Jul 2026 12:00 PM
1 day left
Location
IZATNAGAR, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
Supply Of V-deep Groove Type Six Groove Alternator Pulley 25 Kw, 110/130 Volt Dc Brushless Alternator Suitable For C-122 V-belt Driven System As Per Rdso Drg. No. Skel-3645 (rev.-4) 2014, Conforming To Rdso Specn. No. Rdso/pe/spec/ac/0056-2014 (rev.-1) & Rdso Spec. No. Elps/spec/tl/13 March-1998 [ Warranty Period: 30 Months After The Date Of Delivery ]
End Date
10 Aug 2026 12:00 PM
12 days left
Location
Gorakhpur, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Contact Segment Assembly Type 'c' As Per Clw Drg. No. 3twd.101.109 Alt-5 In Sheet No.1 & 3twd.101.109 Alt-2 In Sheet No.2 (2 Sheets) [ Warranty Period: 30 Months After T He Date Of Delivery ]
End Date
16 Dec 2026 12:00 PM
140 days left
Location
Lucknow, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Dedicated Freight Corridor Corporation of India Limited
2 days left
Development Of 'cargo Related Facilities (crf)' On Dfccil Land (schedule-3) Under The Gct Policy Dated 14.02.2026.
End Date
31 Jul 2026 12:00 PM
2 days left
Location
Noida, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Dedicated Freight Corridor Corporation of India Limited
2 days left
Developmentofgatishaktimultimodalcargoterminalterminalson Non- Railway Land
End Date
31 Jul 2026 12:00 PM
2 days left
Location
Noida, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Corrigendum : Supply Of Maintenance Kit For Double Brake Indicator Ftrtil Part No.790 045 110 (for Faiveley Make Air Brake System) Of Lhb Coaches As Per Pdf Attached. [ Warranty Period: 36 Months After The Date Of Delivery ] ]
End Date
27 Aug 2026 12:00 PM
29 days left
Location
Lucknow, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Department of Defence Production
Expression Of Interest To Invite Prospective And Probable Manufactures/suppliers Various Materials Required For Manufacturing Of Different Types Of Parachutes
End Date
31 Aug 2026 12:00 PM
33 days left
Location
Kanpur, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
Advt Notice For Selection Of House Officer.
End Date
21 Dec 2026 12:00 PM
145 days left
Location
Varanasi, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
Selection Of House Officer.
End Date
21 Dec 2026 12:00 PM
145 days left
Location
Varanasi, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
Supply Of Top Spring Seat For Axle Box Guide Arrgt. To Icf Drg. No.t-0-1-608, Alt.- (small L)/11, Item-1. Material & Specn. Is:2062/2011 With Amndt-1 Of Nov'2012 Grade-e 250 Cu C. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
14 Sept 2026 12:00 PM
47 days left
Location
Gorakhpur, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
Supply Of Safety Strap For Axle Box Guide Arrgt. (bg) To Icf Drg. No. T - 0 - 1 - 631 Alt. (small L)/4. Item-1 Matl. &specn. Is: 2062/2011 With Amndt. No.1 Gr. E250 Quality - A [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
16 Sept 2026 12:00 PM
49 days left
Location
Gorakhpur, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
Supply Of Roller Lever Valve To Kbi Part No. I77338 Or Ftrtipl Part No.040005000 Or Equivalent Part No. Of Sources Approved For Amdbs For Lhb Coaches. Confirming To Rdso Specn. No. Rdso/2011/cg-04 Rev.4. [ Warranty Period: 36 Months After The Date Of Delivery ] ]
End Date
18 Sept 2026 12:00 PM
51 days left
Location
Gorakhpur, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
Supply Of Glass Shutter Assembly For Lavatory Window Frp To Icf Drg. No.icf/sk-5-5-020 Alt.d And Rdso Spec. No. Rdso/2007/cg -2 (rev. 1 Of Feb. 2008) With Amndt. No. 3 Of Feb 2019. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
21 Sept 2026 12:00 PM
54 days left
Location
Gorakhpur, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
Supply Of Lower Spring Seat For Axle Box Guide Arrgt. To Icf Drg. No. Dl - 0 - 1 - 103 Alt. Z/14. Items 1 & 2, Col. Ii. Matl. & Specn. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ]]
End Date
06 Oct 2026 12:00 PM
69 days left
Location
Gorakhpur, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Frp Glass Shutter Assembly For 3 Feet Windows To Icf Drg. No. Icf/sk/5-4-196, Item No.1 To 17, Alt. B . [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
10 Aug 2026 12:00 PM
12 days left
Location
Lucknow, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
Engineering, Procurement & Construction (epc) Tender For Civil Engineering Works, Electrification Works And Signalling Works Of New Single Broad-gauge Line From Maharajganj (excluding) - Anand Nagar (excluding) Section (length: 25.800 Km) In Connection With Anand Nagar-ghughli New Bg Railway Line Project Of North Eastern Railway.
End Date
27 Aug 2026 12:00 PM
29 days left
Location
Gorakhpur, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
16 hours left
Supply Of Sheet Metal Screw Size 10x38 Mm To Is: 7173-1974. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
29 Jul 2026 12:00 PM
16 hours left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
16 hours left
Corrigendum : Supply Of 25 Kw Brushless Alternator (excluding Electronic Rectifier Cum Regulator Unit Or Rectifier Cum Regulator Unit ) Conforming To Rdso Specification No. Rdso/pe/spec/ac/0056-2014 (rev-1) Along With Other Accessories As Per Cl No. 1.3 Of Specification. Note : Suspension Hanger Pin With Split Cotter And Washer Shall Be As Per Rdso Drg. No. Skel-3943 (rev-2)-2016 (alt-1). [ Warranty Period: 30months After The Date Of Delivery ]
End Date
29 Jul 2026 12:00 PM
16 hours left
Location
Gorakhpur, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
1 day left
Supply Of Set Of Copper Pipes For Elgi Make Compressor Consisting Of 04 Items One No Each- (1) Delivery Pipe A With Flange To Elgi Pt. No. 070304930, (2) Delivery Pipe B With Flange To Elgi Pt. No. 070304960, (3) Pipe Cic Tp Hp Cylinder To Elgi Pt No.070401400, (4) Pipe D Cylinder To Ac Elgi Pt No.070301530. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
30 Jul 2026 12:00 PM
1 day left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
Supply Of Hex. Head Screw M16x1.5x50 Mm For Roller Bearing Arrgt. To Icf Drg No. T - 0 - 2 -619 Alt.'y/12', Item-1 Conforming Rdso Spec. No. C-9307 Rev. 2 With Corrigendum-1. Make/ Brand- Tvs, Tuff, Unbrako, Dfl. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
04 Aug 2026 12:00 PM
6 days left
Location
Gorakhpur, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Guide Bush For Axle Box Guide Arrangement To Drg. No. Emu/ M-0-1-023, Alt. E Item No.1col. I. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
12 Aug 2026 12:00 PM
14 days left
Location
Lucknow, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
Supply Of Densified Thermal Bonded Polyster Block Size-1795x583x95 Mm For Middle And Upper Berth To Rcf Drg. No. Ae61444 Alt. F, Item-6, Matl. & Spec. Rdso Spec. C-k607 Rev.-2 Amndt. No. 1 Of Aug. 2016. (drg. Ref. Is Only For Size & Shape Of The Cushion). [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
05 Aug 2026 12:00 PM
7 days left
Location
Gorakhpur, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Railway
Supply Of Hanger Block For Bols Ter Suspension To Drg. No.- T-0-5-638, Alt.-c/13 . To Rdso Spec. No. C-k202 With Amendment Slip No. 1 Of Aug'2002. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
30 Sept 2026 12:00 PM
63 days left
Location
Gorakhpur, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
1 day left
Supply Of Spool Body With Mm Threads For Use In Sand Ejectors Of 3 Phase Wag-9/wap-7 Locos As Per Drawing No. Ngp/trs/4/25.205 Alt 0. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
30 Jul 2026 12:00 PM
1 day left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Select a tender to view details