Showing 1 - 25 of 4,986
Indian Railway
Corrigendum : Supply Of Industrial Insulated Chrome-vanadium Steel Injection Typet- Handle Wrench Size: 1/2 Inch Asper Technical Specification No. Plw/sse/bs/ns/25- 26/ Insulated T Handle Wrench Size 1/2" [ Warranty Period: 12 Months After The Date Of Delivery ] ]
End Date
29 Dec 2026 12:00 PM
153 days left
Location
Patiala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Military Engineer Services
Corrigendum : Term Contract For Artificer Works Of Otm And Md Accn In Nurpur Complex And Fd Hospital Under Age B/r-i Of Ge (s) Mamun
End Date
03 Aug 2026 12:00 PM
5 days left
Location
Pathankot, Punjab
Department
Refer doc
Amount
₹ 20 L
Amount:
₹ 20 L
Northern Railway
Supply Of Hydraulic Motor, Part No.: - H4362960, Make: - Colmar Or Bosch Rexroth. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
31 Aug 2026 12:00 PM
33 days left
Location
Bathinda, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Indian Railway
Supply Of Earthing Switch For Vcb - With Locking Arrangement To Clw Spec. No. Clw/es/3/0010, Alt.-d, And Str No. Clw/2020/eldo/e/str/0039, Rev-1. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
03 Aug 2026 12:00 PM
5 days left
Location
Patiala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Inner Spring. Drawing No: Wd - 83069 - S / 1, Alt.17, Item No. 2. Spec. No:- Wd - 01 - Hls - 1994 (rev. 5). Guarantee :- The Spring Shall Be Guaranteed For A Period Of Five Years From The Dateof Manufacture Of The Spring. (for Details Please See Spec. No. Wd-01-hls-1994, Rev. 5). [ Warranty Period: 60 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
12 Oct 2026 12:00 PM
75 days left
Location
Amritsar, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Department Of Water Resources
1 day left
Corrigendum : Estimate For Brck Lining Of Water Courses Of Outlet Rd 17630/l Of Boha Disty.
End Date
30 Jul 2026 12:00 PM
1 day left
Location
Mansa-P, Punjab
Department
Refer doc
Amount
₹ 56.63 L
Amount:
₹ 56.63 L
Power Department
16 hours left
Corrigendum : The E-auction For The Dismantling Of 20no Quarters 1 No Drain And Uc Fencing At 400kv Ggsstp Ropar On As Is Where Is Basis
End Date
29 Jul 2026 12:00 PM
16 hours left
Location
Mohali, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
National Fertilizers Limited nfl
15 hours left
10MVA 2MVA 1600KVA Transformer;9;8010093A , 8010093B , 8010093C , 8010094A , 8010094B , 8010094C , 8010095A , 8010095B , 8010095C
End Date
29 Jul 2026 11:00 AM
15 hours left
Location
Bathinda, Punjab
Department
Department Of Fertilizers
Amount
Refer doc
Amount:
Refer doc
Department Of Water Resources
Corrigendum : Estimate For Berm Cutting In Kotla Branch Rd 343000-368500
End Date
03 Aug 2026 12:00 PM
5 days left
Location
Mansa-P, Punjab
Department
Refer doc
Amount
₹ 12.22 L
Amount:
₹ 12.22 L
Aditya Birla Housing Finance Limited
16 hours left
Sale Of Property By Aditya Birla Housing Finance Limited, Ludhiana V/s. Pramod Gupta
End Date
29 Jul 2026 12:00 PM
16 hours left
Location
Ludhiana, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Aditya Birla Housing Finance Limited
16 hours left
Sale Of Property By Aditya Birla Housing Finance Limited, Ludhiana V/s. Pramod Gupta
End Date
29 Jul 2026 12:00 PM
16 hours left
Location
Ludhiana, Punjab
Department
Refer doc
Amount
₹ 17.71 L
Amount:
₹ 17.71 L
Department Of Water Resources
16 hours left
Corrigendum : Estimate For Construction Of 1 No. Toilet Unit And Repair Of Roof At Subdivision Office Jhunir At Makhewala (material)
End Date
29 Jul 2026 12:00 PM
16 hours left
Location
Mansa-P, Punjab
Department
Refer doc
Amount
₹ 42.85 K
Amount:
₹ 42.85 K
Power Grid Corporation Of India Limited
16 hours left
Rewinding Of Conductor In Steel Drum Moga Substation
End Date
29 Jul 2026 12:00 PM
16 hours left
Location
Moga, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
RAIL COACH FACTORY
Supply And Installation Of One Coach Set Of Entrance Hand Rail For Train Set Mc, Tc, Ndtc/ec & Ndtc/ec2 Coaches, As Per Drawing: Train18/dtc/ac-6-4-001 Alt Er Col - Iv, Packing Instruction: Pi018 Ver1.0, Installation & Commissioning Inclusive, Biodegradablepackaging. Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
03 Aug 2026 12:00 PM
5 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
RAIL COACH FACTORY
Supply Of Ht Compartment Ss Hatch Door, As Per Drawing: Memu/dmc/3ph-9-0-015 Col- I, Packing Instruction No..pi042 Ver1.0. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
10 Aug 2026 12:00 PM
12 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
NORTHERN RAILWAY
16 hours left
Supply Of Lower Rubber Washer For Axle Box Guide Arrangement Mc To Icf Drg. No. Emu/m -0-1-008 Alt S/ 6. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
29 Jul 2026 12:00 PM
16 hours left
Location
Jalandhar, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
NORTHERN RAILWAY
Supply Of Felt Ring For Roller Bearing Arrgt. Drawing No.:- T-0-2-005 Alt. (t) & (14) Specification;-rdso/2007/cg-09, Amendment -1 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
13 Aug 2026 12:00 PM
15 days left
Location
Amritsar, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
NORTHERN RAILWAY
Supply Of Bellows For Traction Motor. Drawing No: Emu//e3/sk-127/2013, Alt-a. Spec. No : Rdso Spec. No. Spec/e-7/06 (rev-02) Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
13 Aug 2026 12:00 PM
15 days left
Location
Jalandhar, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Power Department
16 hours left
Corrigendum : Repair And Maintenance Of Ds Sub Division Balachaur Under Nawanshehar Circle
End Date
29 Jul 2026 12:00 PM
16 hours left
Location
Nawanshahr, Punjab
Department
Refer doc
Amount
₹ 8.99 L
Amount:
₹ 8.99 L
RAIL COACH FACTORY
Corrigendum : Supply Of Emergency Talk Back Unit (etbu) For Lhb Slr Amrit Bharat Coaches. Note: Safety Clause Must Be Followed According To Annexure-a Of Dy.cple-ii L.no.rcf/emp/1 Dated. 01.04.2025, As Per Drawing: Icf Anneuxre-01 To Rdso_pe_spec_emu_0191 (rev_0) (ref. Md46291 Dated 29.06.24), Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
04 Aug 2026 12:00 PM
6 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
RAIL COACH FACTORY
Corrigendum : Supply Of Under Frame Complete For Vande Bharat Dtc Coach , As Per Drawing: Vd11100 Alt.'a', Packing Instruction: Pi042 Ver 3.0. [ Warranty Period: 84 Months After The Date Of Delivery ]]
End Date
04 Aug 2026 12:00 PM
6 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Power Department
16 hours left
Tender Enq. No. 22/dy.ce /op. Circle, Rupnagar/2026-27 Dt. 19.06.2026 For Work Of Railway Crossing Of 11 Kv, 3 Core 150mm2 Xlpe Cables Under Ds Divn. Anandpur Sahib As Per Dnit.
End Date
29 Jul 2026 12:00 PM
16 hours left
Location
Anandpur Sahib, Punjab
Department
Refer doc
Amount
₹ 8.14 L
Amount:
₹ 8.14 L
Northern Railway
Cess Repair Work In The Sections Under Den/hq/fzr - 333255 Cum At Various Locations At Km 37.11 To Km 38.11, Km 40.13 To Km 41.14, Km 48.9 To Km 49.9, Km 81.7 To Km 85.7 On Ldh-fzr (sl) Section, At Km 10.1 To Km 13.4, Km 14.5 To Km 21, Km 26.2 To Km 32.4, Km 36.3 To Km 41.2, Km 46.3 To Km 49.4, Km 54.7 To Km 54.9, Km 64.4 To Km 64.8, Km 67 To 67.7, Km 70.3 To 70.6, Km 71.2 To Km 72.1, Km 76.8 To Km 77.2, Km 78.6 To Km 79.3, Km 82.7 To Km 84 On Fzp-fka Section, At Km 7 To 8 Km, Km 10 To 12 Km, Km 21 To Km 22.4, Km 22.6 To Km 23.3, Km 41 To Km 42.5, Km 42.6 To Km 43, Km 56.425 To Km 56.65, Km 56.67 To Km 57.2 On Kkp-fka Section, Km 3.6 To Km 7.2, Km 8 To Km 10.5, Km 16.8 To Km 20.3, Km 23.9 To Km 23.11, Km 25 To Km 26.8, Km 28 To Km 29.1, Km 35.2 To Km 39.6, Km 41.2 To Km 41.5 On Abs-fka Section Under The Jurisdiction Of Den-hq/fzr.
End Date
03 Aug 2026 12:00 PM
5 days left
Location
Firozpur, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
1 day left
Supply Of Arrangement Of Uic Rubber Vestibule, As Per Drawing: Assembly Of Dmu/tc/v/ss-2-5-001 Alt R Col- I Item 1 And 10 And Rdso/2007/cg-05 Rev. 01, Packing Instruction No.pi110 Ver3.0 [ Warranty Period: 60 Months After The Date Of Delivery ] ]
End Date
30 Jul 2026 12:00 PM
1 day left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
1 day left
Supply Of Bogie Bolster For Lhb Coaches (qr Code As Per Cde/rcf Letter No. Md44121 Dt. 24.11.2021.), As Per Drawing: 1267420 Ver. 04r1 & Mdts-204001 Rev.01 [ Warranty Period: 36 Months After The Date Of Delivery ] ]
End Date
30 Jul 2026 12:00 PM
1 day left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Select a tender to view details