We are not affiliated with, endorsed by, authorised by, or otherwise connected in any manner whatsoever with the Government e-Marketplace (GeM) or the Government of India. We provide independent advisory and consultancy services only and do not act as or represent ourselves as agents, representatives of any government authority or government entity or government company.

🔴  3 South Western Railway tenders closing in under 3 days — review & act now —  Review & act now
South Western Railway Tenders — Updated July 2026

Latest South Western Railway Tenders — Updated Daily

GeMTech PARAS gives vendors a strategic edge with access to South Western Railway tenders across Karnataka and neighboring regions. From SWR eTenders to Western Railway notices, our portal aggregates railway tender opportunities including procurement, maintenance, and infrastructure projects under one simplified platform.
Read More

Tender Labs aggregates live South Western Railway tenders in one searchable platform. Every active tender is indexed, filtered, and matched to your company profile automatically. Stop manually checking portals — let the data come to you.

808
South Western Railway Tenders Tracked
363+
Clients Across India
4.9
Google Rating
24hr
Response Turnaround
98%
Compliance Rate

    South Western Railway
    Showing 1 to 25 of 808 for South Western Railway Tenders
    South Western Railway
    15 hours left
    Corrigendum : Supply Of Double Sealed Window Glass Unit For Lhb Coaches Fixed Window To Rcf Drg No. Lw 54104 Alt I, To Size 1117(+/-1) X 697(+/-1)x18.38 Mm, With Outer Glass Safety Laminated Float Glass With Pvb Film And Inner Glass Of Toughened As Per Mdts-089 Rev-4 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted:max 8 Lacs ] ]
    End Date 29 Jul 2026 12:00 PM 15 hours left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Corrigendum : Supply And Installation Of One Coach Set Of Seats And Berth Complete(hl3) For Lwscwac/eog Coaches To Drg. No. Lwscwac/eog-6-1-001,alt- J, Col-i. (except Item13) With Upholstery Colour Alnac-03. Cushioning Material Shall Be Pu Foam As Per Rdso Specification No.rdso/2007/cg04, Rev-01 Or Latest And Upholstery To Rdso Spec.rdso/2008/cg-07 Rev-01 Or Latest. For Thickness Of Cushion Refer Drawing 593-6-1-042,alt-e. Installation Required As Per Arrangement Drawing. All Necessary Hardwares Required For Installation Is Under Scope Of The Supplier. Note: Firm Has The Option For Offering Seats And Berths Cushion With Lower Density Of 65 Plus Or Minus 5 Kg/m3 Conforming To Spec.rdso/2007/cg-04, Rev-01 Or Latest Also. [ Warranty Period: 120 Months After The Date Of Delivery ] ]
    End Date 03 Aug 2026 12:00 PM 5 days left
    Location Mysore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Corrigendum : Supply Of Modular Bipolar Hip Prosthesis Set Consisting Of Femoral Stem-01, Titanium Alloy Make, Proximal Stem H A Coated , Morphometric Wedge Design Which Fits For A Wide Range Of Femoral Canal And To Have Two Neck Angles, 02- Femoral Head Cobalt Chromium-1no. 03-bipolar Component Cobalt With Highly Cross Lined Poly Lining ]
    End Date 09 Dec 2026 12:00 PM 133 days left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    15 hours left
    Supply Of Set Of Retaining Rings (pivot Ring & Housing Ring) For Housing Of Traction Bar. Set Consistingof (1) Pivot Ring As Per Clw Drg. No.1209.01.313-005, Alt-2 (ref. Abb Drg. No. Ia016-00261 Rev-3) Qty: 04 Nos/set. And (2) Housing Ring As Per Clw Drg.no.1209.01.313-004, Alt-2 (ref. Abb Drg. No. Ia016-0262, Rev-3). Qty: 04 Nos/set [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 29 Jul 2026 12:00 PM 15 hours left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    15 hours left
    Supply Of Bearing 6206 C3 For Traction Motor Scavenger Blower Motor (de Side / Nde Side). [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 29 Jul 2026 12:00 PM 15 hours left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    330303410015 Supply Of Acrylic Cover For Acp Handle With 3 Inch Hinges (aisi- 304) In L.... Supply Of Acrylic Cover For Acp Handle With 3 Inch Hinges (aisi- 304) In Lhb Coaches As Per Attached Ref. Drawing Note:- Before Bulk Supply Sample May Be Approved [ Warranty Period: 30 Months After The Date Ofdelivery ] ]
    End Date 17 Aug 2026 12:00 PM 19 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Supply Of Cordless Drill Driver As Per The Specifications Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 17 Aug 2026 12:00 PM 19 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Corrigendum : Supply And Installation Of One Coach Set Of Seats And Berth Complete(hl3) For Lwscwac/eog Coaches To Drg. No. Lwscwac/eog-6-1-001,alt- J, Col-i. (except Item13) With Upholstery Colour Alnac-03. Cushioning Material Shall Be Pu Foam As Per Rdso Specification No.rdso/2007/cg04, Rev-01 Or Latest And Upholstery To Rdso Spec.rdso/2008/cg-07 Rev-01 Or Latest. For Thickness Of Cushion Refer Drawing 593-6-1-042,alt-e. Installation Required As Per Arrangement Drawing. All Necessary Hardwares Required For Installation Is Under Scope Of The Supplier. Note: Firm Has The Option For Offering Seats And Berths Cushion With Lower Density Of 65 Plus Or Minus 5 Kg/m3 Conforming To Spec.rdso/2007/cg-04, Rev-01 Or Latest Also. [ Warranty Period: 120 Months After The Date Of Delivery ] ]
    End Date 03 Aug 2026 12:00 PM 5 days left
    Location Mysore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Corrigendum : Supply Of Engine Oil Sae 15w 40 Api-ci-4 Plus Grade Lubricant Oil. Brand: Valvoline Premium Blue 7800 Plus Of M/s. Valvoline Cummins (p) Ltd., Or Equivalent Brand From M/s. Greaves Cotton Ltd., M/s. Koel , M/s. Hpcl, M/s. Bpcl Or M/s. Iocl. Suitable For Cpcb-i And Cpcb-ii Compliant Diesel Engines. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variationpermitted: Max 8 Lacs ] ]
    End Date 03 Aug 2026 12:00 PM 5 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Supply Of Sealed Maintenance Free(smf) 7ah 12v Battery Unit For Automatic Smoke Fire Detection With Alarm System As Per Rdso Specification No. Rdso/2008/cg-04. Make:- Exide, Amaron Or Similar. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 17 Aug 2026 12:00 PM 19 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Supply Of Folding Seat Arrangement For Guard In Slr Coach As Per Rcf Drg No: Lb61101 Alt Dor Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 17 Aug 2026 12:00 PM 19 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Supply Of Pressure Switch Range 1 To 10 Kg/sq.cm, Differential Pressure 0.3 To 1.3 Kg/sq. Cm.max. Pressure 25 Kg/sq.cm, With External Terminal Connection Provision Along With 3/8" Bsp Coupling Nut,packing Washer And Nipple Suitable For Brazing Copper Pipe Of 10mm.od And 6mm.id, Switch 1 Spdt (1no And 1nc Contacts), 10amps,125v Ac Or Dc Rt 116 Sbx Of Indfoss Make Or Similar. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 17 Aug 2026 12:00 PM 19 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    15 hours left
    Supply Of Hexagonal Head Screw For Axle End Locking To Icf Drg. No. T-0-2-619, Item-1, Alt. Y/12 [m16 X1.5 X 50 Mm] Make/brand: Tvs Or Dfl Or Unbrako Or Tuff Only. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variationpermitted: Max 8 Lacs ] ]
    End Date 29 Jul 2026 12:00 PM 15 hours left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Corrigendum : Supply Of 24 Volt Starter Battery Charger Suitable For 500 Kva Da Set Of Lhb Power Car, Confirming To Rcf's Specn.no.edts-106 (rev-0) With Latest Modifications & Corrections. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
    End Date 03 Aug 2026 12:00 PM 5 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Supply Of 3/8 Isolating Cock With Vent For Emus.as Per Kpa Drg. No. Er/kpa/el/va.3hb.159e, Item-f. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 17 Aug 2026 12:00 PM 19 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Supply Of Pvc Turf Mat For Vande Bharat Train Lavatories. Note: 1. Item To Be Suppliedas Per Attached Spec. 2. Item To Be Supplied In Width 4 Ft. X Length 125 Ft. = Total 500 Sq. Ft. Having Antiskid Feature, Colour - Green. 3. Accepted Make: Duro Turf/ Finn Turf/ 3m Only. 4. 01nos Of 4ft X 10 Ft Sample Shall Be Supplied Before Bulk Supply. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 17 Aug 2026 12:00 PM 19 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    I) Provision Of Irs Type Platform Shelter For A Length Of 175meters(leftover) At Pf No.01 At Hubballi Station Ii) Dharwad -augmentation Of Training Facilities At Training Center Iii) Hubballi- Proposed Construction Of S&t Training Centre At Hubballi Iv) Proposed Replacement Of The Foot Over Bridge (clr-54a) At Km.24/300-400 At Castlerock Yard(clr) In Ld-vsg Section.
    End Date 03 Aug 2026 12:00 PM 5 days left
    Location Dharwad, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Proposed Construction Of Rub At Lc No 286 At Km 474/000-474/100 In Between Unk-bdka Section
    End Date 03 Aug 2026 12:00 PM 5 days left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    I) Improvement To Personnel Department Staff Halls,conference Hall,officerschamber And Washrooms At Rail Soudha Hubballi Ii) Hubballi Division:- Gdg - Hg Section: Construction Oflimited Height Subway In Lieu Of Lc No.112 Km 247/1-2 In Between Idr-lhn Stationrespectivelv.
    End Date 03 Aug 2026 12:00 PM 5 days left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Corrigendum : Request For Proposal (rfp) For Appointment Of Authority Engineer For Providing Project Management Services For Design,supply, Construction, Installation, Testing And Commissioning Of Integrated Rolling Stock Coaching Depot At Hubballi Including All Civil, Electrical General, Electrical Traction, Signalling & Telecom Works And Machinery, Tools & Plants" (the "project") Through Engineering, Procurement And Construction (the "epc").
    End Date 04 Aug 2026 12:00 PM 6 days left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    1 day left
    Supply Of Lead Acid Low Maintenance Secondary Cells 2v 300 Ah Capacity 10 Hr. Rate Of Discharge At 27%u2070c Assembled In Hard Rubber Container With Tubular Positive And Negative Plates Conforming To Rdso Spec.irs:s:88/2004. The Cells Shall Be Supplied With Microporous Vent Plugs Cum Sealed Floats Intercell Connectors Nut Bolts And Washers. The Cells To Be Supplied In Dry And Uncharged Condition Without Tool Kit. Battery Type: Sb 300st. As Per Specn. Rdso Spec.irs:s:88/2004 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted:max 8 Lacs ] ]
    End Date 30 Jul 2026 12:00 PM 1 day left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Signalling Works In Connection With "hebsur: Provision Of 02 Additional Loop Lines."
    End Date 03 Aug 2026 12:00 PM 5 days left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Supply Of High Capacity Side Buffer Assembly As Per Rdso Drg. No. Skdl-4561 Alt 2, And As Per Rdso Spec No Mp- 0.41.00.03 Rev. 03 , August 2024 , Amendment Slip No. 1, September 2025 Of Specification No. Mp- 0.41.00.03 Rev. 03 , August 2024 . [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
    End Date 03 Aug 2026 12:00 PM 5 days left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    15 hours left
    Supply Of Folding Table For Fac Coaches As Per Drg.no. Icf/sk-6-4-024 Alt-c/2 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 29 Jul 2026 12:00 PM 15 hours left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    15 hours left
    Mys-ask Section: Elimination Of Lc No.72 At Km.82/900-83/000 Between Anc-hln Stations By Construction Of Sub-way
    End Date 29 Jul 2026 12:00 PM 15 hours left
    Location Mysore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc

    Select a tender to view details

    The Problem

    Why South Western Railway Tenders Get Rejected at the Technical Stage

    These are the most common rejection reasons our team sees — all 100% avoidable with the right support.

    Documentation Errors
    Incorrect formats or missing mandatory certificates often lead to rejection.
    Submission Delays
    Waiting until the last minute often leads to technical glitches & failure.
    The Solution

    Everything You Need to Win South Western Railway Tenders — In One Platform

    End-to-end bid support from documentation to order confirmation.

    📁
    Documentation Support
    We prepare your complete technical & financial bid folders — rejection-proof.
    • EMD / Bank Guarantee preparation
    • QR certificate compilation & verification
    • MAF & OEM authorization letters
    💻
    Portal Management
    End-to-end bid submission so you never miss a deadline.
    • Bid submission on portal
    • Document upload & correct tagging
    • Deadline alerts & reminders
    🤝
    Post-Bid Support
    We stay with you from submission to order confirmation.
    • Technical Query (TQ) response
    • Evaluation stage liaisoning
    • LOI / Work Order follow-up
    Our Process

    How It Works — 4 Simple Steps

    1
    Eligibility Check
    WhatsApp company profile, AI checks QR fit within 2 hours
    2
    Document Review
    we audit existing documents against tender requirements
    3
    Bid Preparation
    we prepare all technical & financial folders, 100% compliant
    4
    Submit & Win
    submission supported through evaluation
    FREE DOWNLOAD
    South Western Railway Tender Checklist:
    10 Must-Have Documents
    The exact checklist our team uses for every South Western Railway bid — never get rejected for a missing document.
    FAQ

    Frequently Asked Questions about South Western Railway Bidding

    How to register as a vendor for South Western Railway?

    Submit the required registration form along with your company registration documents, GST certificate, PAN, and relevant experience certificates on the South Western Railway vendor portal. You'll also need to clear a financial assessment. Tender Labs manages the entire empanelment process — contact us for a free eligibility assessment.

    What is the EMD requirement for South Western Railway tenders?

    EMD is typically 2–3% of the estimated tender value, submitted as a Bank Guarantee (BG) from a scheduled commercial bank. The bank branch and BG format must be pre-approved. Submitting a DD or an incorrect BG format is the single most common rejection reason. The exact amount and format are always specified in the NIT — we verify this for every bid we manage.

    Chat with a South Western Railway tender Expert